About Christian Carlson

This author has not yet filled in any details.
So far Christian Carlson has created 40 blog entries.

Emissions Reduction and Gas Recovery for Pipeline Compressor Operations

Altamira designed and integrated a methane recovery system for a major natural gas operator, reducing emissions, recovering vented gas and improving compressor station sustainability and operational efficiency.

Emissions Reduction and Gas Recovery for Pipeline Compressor Operations2026-07-02T11:42:25-05:00

Altamira To Attend the 2026 SGA Operations Conference

Connect with Altamira at the 2026 SGA Operations Conference in Austin as we engage industry leaders, share regulatory and operational expertise and explore innovative solutions for the natural gas industry.

Altamira To Attend the 2026 SGA Operations Conference2026-07-02T11:18:15-05:00

New Source Performance Standards (NSPS) OOOOb Compliance and Regulatory Support

We provided NSPS OOOOb compliance support for more than 100 oil and gas facilities, delivering emissions modeling, PE-certified documentation and annual reporting to ensure full regulatory compliance.

New Source Performance Standards (NSPS) OOOOb Compliance and Regulatory Support2026-07-03T11:18:45-05:00

Project Engineer – Houston, Kingwood or Angleton, TX

We are seeking a licensed Project Engineer with 5–10 years of experience to lead oil and gas infrastructure projects, ensuring technical excellence, regulatory compliance and successful project delivery.

Project Engineer – Houston, Kingwood or Angleton, TX2026-07-01T11:38:38-05:00

Altamira to Exhibit at the 2026 RRC Regulatory Conference

Altamira will exhibit at the 2026 RRC Regulatory Conference, showcasing its expertise in regulatory compliance, pipeline integrity and environmental solutions while connecting with industry leaders and regulators.

Altamira to Exhibit at the 2026 RRC Regulatory Conference2026-06-18T12:24:43-05:00

Facility Siting Study for PSM-Regulated Midstream Facilities

Altamira conducted a facility siting study evaluating process hazards at PSM-regulated midstream facilities, confirming occupied buildings were safely located and compliant without requiring additional mitigation to protect personnel.

Facility Siting Study for PSM-Regulated Midstream Facilities2026-07-03T11:21:49-05:00
Go to Top