Natural Gas Transmission and Distribution Pipeline Replacement

Altamira delivered environmental and engineering services for an 11,000-foot natural gas pipeline replacement, navigating wetlands, regulatory requirements and stakeholder coordination to support successful permitting, design and construction planning.

Natural Gas Transmission and Distribution Pipeline Replacement2026-11-10T11:16:43-06:00

Concurrent Environmental Due Diligence for Multi-State Oil and Gas Acquisitions

Altamira successfully managed concurrent environmental due diligence for two major multi-state oil and gas acquisitions, delivering on-time risk assessments that helped the client evaluate liabilities, strengthen negotiations and make informed investment decisions.

Concurrent Environmental Due Diligence for Multi-State Oil and Gas Acquisitions2026-11-10T10:39:01-06:00

Developing a Standardized Facility Design Package for Oil Production Facilities

Altamira used LiDAR scanning and 3D modeling to create a standardized facility design package, providing an oil producer with a repeatable framework for future engineering, procurement and construction projects.

Developing a Standardized Facility Design Package for Oil Production Facilities2026-11-02T12:39:47-06:00

Tank Release Consequence Modeling and HCA Screening

Altamira modeled catastrophic tank release scenarios to identify potential High Consequence Area impacts, evaluate spill behavior over time and support risk-informed emergency response, regulatory compliance and facility planning decisions.

Tank Release Consequence Modeling and HCA Screening2026-10-29T11:56:49-05:00

MAOP/MOP Confirmation Utilizing Non-Destructive Examination

Altamira used Instrumented Indentation Testing (IIT) and targeted exploratory digs to verify pipeline material properties, enabling MAOP/MOP confirmation, supporting regulatory compliance and avoiding costly destructive testing.

MAOP/MOP Confirmation Utilizing Non-Destructive Examination2026-10-13T12:09:54-05:00

Turning LiDAR Into a Scaled 3D GIS View of an Industrial Piping Facility

Altamira transformed LiDAR survey data into a scalable 3D GIS model of an industrial piping facility, enabling visualization of pipelines and assets through an interactive dashboard supporting planning, analysis and asset management.

Turning LiDAR Into a Scaled 3D GIS View of an Industrial Piping Facility2026-10-06T22:40:25-05:00

Class and Gathering Analysis for a Newly Acquired Gas Gathering System

Altamira performed a class and gathering analysis for 45 miles of acquired gas gathering pipeline, delivering segment-level regulatory classifications that enabled seamless integration into the client's compliance and integrity management programs.

Class and Gathering Analysis for a Newly Acquired Gas Gathering System2026-09-09T22:34:14-05:00

Class Location and Gathering Type Verification Utilizing the IntegrityMap HCA Gas Tool

Altamira used its proprietary IntegrityMap HCA tool to revalidate pipeline Class Location and HCA designations, updating integrity records, improving regulatory defensibility and reducing higher-consequence pipeline segments based on current site conditions.

Class Location and Gathering Type Verification Utilizing the IntegrityMap HCA Gas Tool2026-09-02T10:11:14-05:00

Oil and Gas Comprehensive Environmental Air Audit

Altamira conducted a comprehensive environmental air compliance audit of 35 acquired oil and gas facilities, identifying permitting and regulatory requirements, compliance gaps and needed permit modifications to support ongoing operational compliance.

Oil and Gas Comprehensive Environmental Air Audit2026-10-01T12:05:40-05:00